
Falcon 10X Delayed to 2027: Smart Bridging Strategies Until Your Delivery
Your 10X Is Pushed—Here’s How to Keep Flying (and Keep Options Open)
Don’t just wait. Use smart interim lift and protect your exit.
Intro:
Dassault’s 10X schedule moved right. If you’re committed to the 10X cabin and range, you need a bridging plan that won’t nuke your capital or resale profile.
Option A: Structured Charter Blocks
Guaranteed availability, capped CPI escalators, and cabin class matching.
Pros/cons vs. ad‑hoc charter and memberships.
Option B: Interim Ownership
Late‑model Global/G650ER/G700 pros/cons.
Residual risk and the upgrade timing window.
Option C: Fractional & Leaseback Hybrids
Share sizes, call‑out windows, revenue programs.
Tax and accounting wrinkles.
Protecting Your Exit
Engine/APU programs; maintenance status; days‑to‑market discipline.
Connectivity/cabin upgrades that actually pay back on resale.
We’ll design a bridge plan that gets you 10X‑like capability now—without handcuffing you in 2027.